- Summer 2024Planning
- Spring 2025Engineering
- Summer 2025Permitting
- Fall 2025Bid

Project Description
Replace/upsizing approximately 4,200 liner feet of water main along Edmund Highway to ten (10) inch watermain and the installation of approximately 500 LF of six (6) inch water main along Maple Street.
Project Contractor
Project contractor name
Project Engineer
Michael Baker International