Project Description
Includes the installation of a new 12-inch force main and a 16-inch force main to enhance wastewater conveyance between the existing Bluefield Pump Station and the South Lake Pump Station in Lexington County, SC. The project route follows Bluefield Road and connects two major pump stations, improving system capacity and reliability. The 12-inch line runs from the Bluefield Pump Station along Bluefield Road, transitioning to a 16-inch line near South Lake Drive leading to the South Lake Pump Station. This upgrade is led by the Joint Municipal Water and Sewer Commission to support growing infrastructure demands and ensure long-term service sustainability.
Project Engineer
Highfill Infrastructure Engineering