Projects

 

Water System Expansion to Batesburg-Leesville
Construction of approximately 30,000 linear feet of thirty (30) inch water main and associated appurtenances along Old Farm, Rawl, Smith Pond, Belo and Roscoe Road. This will be a new transmission main to increase capacity to the southern side of the system and relieve pressure off of Highway One...
Construction of an 2-million gallon Elevated Water Tank to supply the new Calico Farms and surrounding areas with water. May adjust the hydraulic grade line in the area with the construction of this tank.
Construction of approximately 15,000 linear feet of twenty-four (24) inch water main and associated appurtenances along Calks Ferry Road and Windy Woods Lane. This will act as an additonal feed to the proposed Windy Woods Tank and a point of connection for western system expansion.