Projects

 

Water System Expansion to Batesburg-Leesville
Project Status
Project Category
Construction of approximately 9,000 linear feet of twenty-four (24) inch water main and associated appurtenances along Platt Springs Road from Platt Springs Rd Tank to White Knoll High School. 2024 Master Plan Projects #1. System demand in the area has expedited this project.
The SCDOT Bethany Church/Boiling Springs Traffic Circle Water Line Relocation project involves relocating a section of the existing 12-inch water main to accommodate the construction of a new traffic circle at the intersection of Bethany Church Road and Boiling Springs Road in Lexington County, SC...
The SCDOT Hwy 6/Meadowfield Traffic Circle Water Line Relocation project involves relocating a portion of the existing 12-inch water main to accommodate the installation of a new traffic circle at the intersection of Highway 6, Jim Spence Road, and Meadowfield Road in Lexington County, SC. The...
Construction of approximately 5,400 linear feet of twenty-four (24) inch water main and associated appurtenances along Sherwood Road from Roscoe Road to Calks Ferry Road. Note: This project has been combined with the Water Main Improvements - Charter Oak Tank to Sherwood Dr. Project and will be bid...
The project will consist of constructing approximately 1,700 linear feet of 10" water main, 3 fire hydrants, water main tie ins to intersecting streets, and appurtenances. The new 10" water main will replace the existing 6" water main from the intersection of Maple Street at Pine Street to the...
Note: This project has been combined with the Sherwood Waterline Extension Project (shown on website as a separate project) and will be bid as one project. Construction of approximately 36,250 linear feet of water main and associated appurtenances along Old Farm, Rawl, Smith Pond, Belo, Roscoe Road...
Construction of an 2-million gallon Elevated Water Tank to supply the new Calico Farms and surrounding areas with water. May adjust the hydraulic grade line in the area with the construction of this tank.
Construction of approximately 15,000 linear feet of twenty-four (24) inch water main and associated appurtenances along Calks Ferry Road and Windy Woods Lane. This will act as an additonal feed to the proposed Windy Woods Tank and a point of connection for western system expansion.